WIND POWER PLANT
Power Business
Wind Turbine is a device used to extract the kinetic energy from the wind and transform the kinetic energy into the mechanical energy. Then the mechanical energy is utilized. In other word, when the wind blows through the turbine the kinetic energy is transferred to the turbine blades to cause the turbine to rotate. This energy from the rotation can be utilized. The amount of the electricity produced is depended on the speed of the wind, the length of the blade, and the location of the wind turbine. The company has 8 wind power plant projects with total capacity of 386 MW.

Wind power plant project
capacity of 260 MW : Totally 5 projects located In Chiyaphum province.
No. Name of project Capacity Location Status
1 Hanuman 1 & 8 90 Megawatts Thep Sathit District, Chaiyaphum Province The project has achieved the Commercial Operation Date since 25 January 2019
2 Hanuman 5 48 Megawatts Thep Sathit District, Chaiyaphum Province The project has achieved the Commercial Operation Date since 22 March 2019
3 Hanuman 9 42 Megawatts Thep Sathit District, Chaiyaphum Province The project has achieved the Commercial Operation Date since 30 March 2019
4 Hanuman 10 80 Megawatts Bamnet Narong District, Chaiyaphum Province The project has achieved the Commercial Operation Date since 13 April 2019
Remark : Scheduled Commercial Operation Date (SCOD) is specify date of distribute as stipulated in PPA contract.
Scheduled Commercial Operation Date (SCOD) in above schedule is starting sale electric as stipulated in proposal of sale. Currently, company is not yet made contract with EGAT.
Adder : 3.50 Baht per kWh for 10 years since COD
BOI Tax Privileges : BOI has already approved to promote the project
Watch VIDEO
about-E@
Other businesses in Power Business
WIND POWER PLANT
Power Business
SOLAR POWER PLANT
Power Business